Sino Iron renovation project was successfully delivered
2023-12-21
E-House products of South Seas adhere to the concept of refactor for better, adopting a new structural design concept. Under the extreme weather conditions of meeting the maximum wind load of 316 kilometers/hour, all door frames are replaced by bolted connections, achieving a 37% reduction in carbon emissions.This project was successfully delivered as per schedule at Changshu Port, Jiangsu in September 2023.